Machinery guide · Technical purchasing

Preparing a machinery specification

Describe the job the machine must perform, not just its name. Put input characteristics, throughput, output quality, site conditions and acceptance tests in one specification.

Define the process and boundaries

In a seed or pulse processing line, for example, product type, input dimensions, moisture range and contaminants affect how throughput should be interpreted. Distinguish a single machine from a complete line. Identify feeding, transfer, packing and auxiliary units required.

This guide is not an engineering design or a performance claim for any model. A supplier must assess actual product and site data.

Make performance measurable

State throughput units, operating duration, acceptable product loss and output-quality criteria. Replace “high efficiency” with the result to be measured, the sample and the measurement method.

Ask whether quoted capacity is nominal or measured under specific product conditions. Include product changeover and cleaning requirements in the production plan.

Check the site and applicable compliance

List footprint, access height, electricity, compressed air, dust collection and other connections. Make drawing units and electrical requirements explicit. State who handles installation and commissioning.

Check the product rules applicable in the destination market. The EU’s CE guidance explains that marking applies to products covered by relevant rules; it should not be treated as a universal quality label for every machine.

Agree acceptance and after-sales scope

Ask at quotation stage which material, duration, measurements and records will be used for factory and site acceptance. Document the next steps if performance does not meet the agreed criteria.

  • Included equipment and work the site must provide.
  • Operator training, manuals and document languages.
  • Spare parts, consumables and support scope.
  • Warranty terms and delivery or installation exclusions.
Your working checklist

Machinery specification checklist

Use this list to bring the essential information together before your consultation.

Selections stay on this open page and are not sent to our team. Print your completed checklist to keep a copy.

Sources and scope

Sources checked on 24 October 2026. The checklist supports general preparation; requirements specific to a person, product or institution need separate confirmation with the relevant official source and responsible professional.